1.Water fall model has _______ steps of phases?
a.5
b.4
c.6
d.8


2.design phase is followed by?
a.coding
b.testing
c.debugging
d.maintenance/p>


3.Water fall model is a ______ model
a.Linear
b.iterative
c.interactive
d.rapid

4.Water fall model is also called
a.Classical life cycle model
b.spiral model
c.RAD
d.customer model


5.Prototyping model begins with
a.coding
b.requirement gathering
c.test prototype
d.none of the above/p>


6._______is not a phase of prototyping model
a.maintenance
b.cutomer test mock-up
c.build mock-up
d.listem customer


7.prototyping is preferred by
a.customer
b.Developer
c.No one
d.Both


8.Spiral model is an
a.Incremental model
b.Linear modelr
c.Evolutionary model
d.None of the above


9.Spiral model is divided into _______ task regions
a.3
b.4
c.5
d.6


10.Spiral model begins with
a.Design
b.Coding
c.Risk Analysis
d.Re-engineering


11._______ is present in Spiral model
a.Code generator
b.Code optimizer
c.Risk Analysis
d.Re-engineering



12.Spiral model expands
a.outwards clock wise
b.outwards anti-clockwise
c.Inner anti-clockwise
d.Inner clockwise



13.Software metrics can be
a.public or private
b.process or project
c.a,b
d.None of above


14._____ is/are private metrics
a.individual defect rates
b.module defect rates
c.Errors in development
d.All of above


15.LOC measure is a ________
a.Size oriented metrics
b.Function oriented metrics
c.Both
d.None


16.LOC metric are
a.Programmer dependent
b.Customer dependent
c.Programming language dependent
d.All of above


17.Software project planning involves_________ estimation
a.Software scope
b.Resource (Hardware)
c.Resource( Software Components)
d.All of the above


18.________ is a software project estimation technique
a.LOC method
b.COCOMO
c.a and b
d.None


19.Software sizing involves
a.Fuzzy loging sizing
b.FP sizing
c.Change sizing
d.all of above


20.Formula of 3-point value is
a.(S
b.FP sizing
c.Change sizing
d.all of above


21.In system design , we do following
a.Hardware design after software
b.Software desing after hardware
c.parallel hardware and software design
d.No hardware design needed


22.__________ is not a part of system design
a.partition requirements
b.test subsystem
c.identity subsystem
d.define sub-system requirements


23.__________ is the last step of function oriented design
a.software design
b.data design
c.detailed design
d.interface design


24.Detailed design is expressed by
a.PDL
b.Graphical notations
c.Programming language
d.all of above


25.Detailed design produces
a.CSPEC
b.PSPEC
c.MINI SPEC
d.code SPEC


26.user interface design involves following issues
a.Error message handling
b.System response time
c.command labeling
d.All of the above


27.user interface design involves ________ model
a.design
b.spiral
c.SDLC
d.None of above


28.UID is an__________ process
a.sequential
b.iterative
c.both
d.None of above


29.__________ is not a design level metrics
a.Low level metric
b.High level metric
c.component level metric
d.interface design metric


30.Component level design metric include
a.Cohesion metric
b.coupling metric
c.complexing metric
d.all of the above

2 comments:

  1. 1. ANS: a.
    2. 2. ANS: a.Linea
    3. 3. ANS: coding
    4. ANS: a.classical life cycle model
    5. ANS: b.requirement gathering
    6.ANS: a.maintenance
    7.ANS: d.both
    8.ANS: d.none of the above
    .9. ANS: d.6
    10. ANS: c.Risk Analysis
    11. Ans. B. code optimizer
    12 ANS: a.outwards clockwise
    13 ANS: b.process or project
    14. ANS: a.individual defect rates
    15. ANS: a.size oriented metric
    16 ANS: d. all of the above
    17 ANS: all of the above
    18 ANS: c.a and b
    19. ANS: d.all of the above
    20 a..
    21. ANS: b. software design after hardware
    22. ANS: a. partition requirements
    23 ANS: c
    24. ANS: d.all of above
    25 ANS: c
    26 ANS: d.all of the above
    27. ANS: b.spiral
    28. ANS: b.iterative
    29.Ans. a low level mettric
    30. ANS: d.all of the above

    ReplyDelete